In reviewing the procedure to upgrade to R5.5 from R5F27 I am thinking about how I would upgrade my system which has 1MBE, 1SBE, 3 Front ends.

Would I be better off doing:
- Auto upgrade of MBE (which has database)
- Fresh install of all Front ends using the same system name as I had before

Or is there a reason to do an upgrade on the front end?

Note 2 front ends will be upgrading with their existing HW and I already built scripts to re-install the mods I have (e.g. fstab, alsa, xorg, etc).

One of the Front ends is a complete replacement of an older piece of hardware.

I'm really just looking for the simplest path. I'm also concerned that if I auto-upgrade a front end only system that it may muck up the database in some way.

Any input is appreciated.

C


Top
 Profile  
 
 Post subject:
PostPosted: Tue Feb 24, 2009 11:11 pm 
Offline
Joined: Mon Dec 24, 2007 9:47 am
Posts: 535
Location: Ottawa, Canada
While I didn't get a response to this, I thought it was worthwhile to let others know how I did this.

I have my KM Master Back end running on VMware on one of my main network servers as a Guest application.
I run a generic myth on CentOS4 Slave backend on the host of the vmware environment so that it can access my PVR500 card.
I have three front ends running KM.

I did an auto-upgrade on the Master backend. The beauty of doing it in a VM was I could take a snapshot and practice the upgrade. This was a good thing as I needed to do some tweaking and minor work arounds. I could always go back to my working version if things went bad.

I then had spare drives for the front ends and did fresh installs of 5.5 on them. I used spare drives so I could test and configure without taking my whole myth network down and thus suffer the wrath of my family.

Once I was happy with the results, I updated the vmware MBE, swapped in the new hard drives to all the front ends.

Finally I did an update on the slave backend to bring the recorders back in to the network.

after the network upgrade, I went around and fixed all the little quirks that happen in a set up this complex.

Total actual network outage was less than an hour once I started the network upgrade.

It is also worth noting that when I originally set up each machine, I made careful notes about all deviations and work arounds required. I also kept copies of the main files (e.g. xorg.conf, lircrc, fstab, etc). This was handy when I was updating.

Christ.


Top
 Profile  
 

Display posts from previous:  Sort by  
Post new topic Reply to topic  [ 2 posts ] 


All times are UTC - 6 hours




Who is online

Users browsing this forum: No registered users and 18 guests


You cannot post new topics in this forum
You cannot reply to topics in this forum
You cannot edit your posts in this forum
You cannot delete your posts in this forum
You cannot post attachments in this forum

Jump to:  
cron
Powered by phpBB® Forum Software © phpBB Group

Theme Created By ceyhansuyu